< Back to portfolio

Suspended Access

Date:
Dec 2011

Site:
PWC, Embankment Place, London

Share:



4m x 3m x 4No. lift scaffold to access existing flues, all suspended from cantilever beams supported on existing cradle stubs on an adjacent roof. Cantilevering 4m, very careful beam design was necessary to control deflection and loads onto the existing structure.