Date:
Apr 2011

Site:
Harborne Junior & Infant School, Birmingham

Share:



Following a fire we were called out in an emergency to design a shore to the damaged portion of building. Following an initial assessment we advised setting out and gave guidance at site. We then developed a full scheme and delivered it back to site the same day so that the shore could be erected safely and with good time to make the building as safe as possible.