< Back to portfolio

Bridged and Cantilevered Access

Date:
Jan 2012

Site:
Sparkhill Library

Share:



25m high tied and butted Access Scaffold to the clock tower, bridged and cantilevered at high level over adjoining roofs and buildings and incorporating public and driveway protection at lower level.