< Back to portfolio

21No. Lift Access Scaffold

Date:
Sep 2012

Site:
Tricorn House, Five Ways, Birmingham

Share:



21No. 2.0m lifts high fully boarded Class 2 live loaded access scaffold to three sides of the existing building corner wing. Scaffold is erected in stages. First stage to allow for repair and replacement works to the existing sign. Second stage to the full height of the building. The scaffold is plan braced at every lift to provide structural stiffness to the standards.

Photos 1 and 2  -  Access to the existing sign.

Photos 3 and 4  -  Erection in progress on the 15th lift.

Photo 5  -  Completed scaffold to full height.